Back to SEQUENCE OF SERIES
JEE MATHEMATICS MCQ: SEQUENCE OF SERIES
1
Easy
1 of 1
Application
+4 | -1
150 workers were engaged to finish a piece of work in a certain number of days. 4 workers dropped the second day, 4 more workers dropped the third day and so on. It takes eight more days to finish the work now. The number of days in which the work was completed is
View answer and explanation
Correct option: C
25
Option C (25) is correct because it is the number of days calculated by setting up an AP series representing the decreasing number of workers and solving for the original number of days.
More Questions from SEQUENCE OF SERIES
Practice All Chapter MCQs →
Given the sets , then find the following
(i)
(ii)
(iii) If are in A.P.; are in G.P. and are in G.P., then are in Suppose is expressed as a polynomial in , as where , then equals If and are in , where and c are in , then are the lengths of sides of If the sum of three numbers in G.P. is 63 and the product of the first and the second term is of the third term, then the numbers are If the lengths of sides of a right angled triangle are in A.P., then their ratio is
(i)
(ii)
(iii) If are in A.P.; are in G.P. and are in G.P., then are in Suppose is expressed as a polynomial in , as where , then equals If and are in , where and c are in , then are the lengths of sides of If the sum of three numbers in G.P. is 63 and the product of the first and the second term is of the third term, then the numbers are If the lengths of sides of a right angled triangle are in A.P., then their ratio is
